Cortizo Construction
Cortizo Construction
  • Home
  • Services
  • Projects
  • About us
  • Contact
  • Más
    • Home
    • Services
    • Projects
    • About us
    • Contact

  • Home
  • Services
  • Projects
  • About us
  • Contact

RODRIGUEZ RESIDENCE

A full renovation emphasizing sequencing & flexible schedule

 Project Type  

Full residential renovation with structural modifications


Timeline

2025

LEARN MORE

Overview

 The Rodriguez Residence was a comprehensive home renovation that required careful planning, structural coordination, and strong schedule management. The scope included the complete demolition of a detached studio, the renovation of three bathrooms, including the relocation of one, and a full kitchen transformation. 


To create an open and functional kitchen, we removed a structural wall and installed a metal beam with supporting columns. This change also required partial roof reconstruction to properly integrate the new layout. 


The project also included new impact windows and new sliding doors, bringing in more natural light and improving the home’s connection between interior and exterior spaces. 

The Challenge

 

This project tested scheduling more than anything else. With multiple trades, inspections, custom materials, and structural modifications involved, sequencing became critical. A delay in the kitchen cabinets caused by a paint issue required us to adjust the construction flow while protecting the client’s move-in timeline.


Rather than rushing the final stages, we reorganized the schedule to maintain quality and reduce stress for the homeowners.

What we learned

The standards it reinforced

The standards it reinforced

 

  • Structural changes require additional buffer time in the schedule.
  • Custom finishes should always be planned with contingencies.
  • Window and door installations must be coordinated carefully with inspections and finishes.
  • Flexibility in scheduling protects both quality and client experience.

The standards it reinforced

The standards it reinforced

The standards it reinforced

 

This project strengthened how we manage time and expectations:


  • Building schedules with realistic buffers.
  • Planning for material delays before they happen.
  • Sequencing trades to maintain momentum even when one scope pausescating openly when adjustments are needed.

Why this project matters

The standards it reinforced

Why this project matters

The Rodriguez Residence confirmed that a successful renovation is not defined by how fast it moves, but by how well it adapts. By allowing flexibility in the schedule, we were able to finish the project before the client’s move-in date, turning a potential challenge into a positive experience. 

Experience shared

This project reinforced a key principle we carry into every renovation, thoughtful planning and flexible scheduling create better outcomes for both the build and the people living in it.

The Rodriguez Residence reflects our commitment to planning with flexibility, so our clients can move forward with confidence.

CONTACT US

Copyright © 2026 Cortizo Construction LLC - Todos los derechos reservados.

Con tecnología de

Este sitio web utiliza cookies

Usamos cookies para analizar el tráfico del sitio web y optimizar tu experiencia en el sitio. Al aceptar nuestro uso de cookies, tus datos se agruparán con los datos de todos los demás usuarios.

Aceptar